Work will start on South Salina Street near East Adams Street and move south to other signalized intersections on South Salina Street, Seneca Turnpike, Valley Drive, South Avenue and West Onondaga Steet, forming a communication loop. Work will then take place at signalized intersections along East Genesee Street between Columbus Avenue and the city boundary. Through traffic will be maintained on the roads while work is being done. The work will enable traffic signal communication in these areas.
Site History & Existing Conditions: The interconnect system is a traffic signal communication system that allows traffic signals to be remotely controlled from the Traffic Control Center located at the City’s Department of Public Works. The city's first interconnect system was installed Downtown in the 1990s. An additional traffic signal communication loop was added to the Westside along West Genesee Street in the 2010s.
Project Objectives: This project will build out the southern and eastern portions of the city's traffic signal interconnect system. The primary objectives of this project are to:
Kelly Montague, Infrastructure Public Information Officer
(315) 263-2467
press@syr.gov
Lead Department: Engineering
Participating Departments: Public Works
Project Type: Traffic Signal Equipment and Sidewalks
April 2023
2024